Our friendly team is here to help.
Lines open Mon-Fri from 7am to 5pm. Saturday 7am to 12pm
Please feel free to contact us if you have any further questions or concerns
Maximum file size: 516MB
Please note that a vehicle crossover will always include us excavating and removing the whole of the existing pavement, excavating down to create a deeper sub-base, before re-laying the tarmac to an increased specification as per Highways’ requirements. We can never simply ‘lower the kerbs’, there is no way to leave the existing pavement in.